Thursday, 3 September 2015

LASG Sets Sept. 30 for Completion of Ikotun-Ejigbo Road

                             


The Lagos State Government yesterday directed that the on-going reconstruction of Ikotun-Ejigbo-Oke-Afa road should be completed on or before September 30 to put an end to the plight of the people on the axis.
The state government added that the road reconstruction would end a decade-long menace of flooding and erosion, which it said, was as a result of the abused use of drainages and collector drains along the corridor.



The General Manager of Lagos State Public Works Corporation (LSPWC), Mr. Ayotunde Sodeinde gave the deadline while inspecting the road project, which he said, was completely collapsed before the recent intervention.


No comments:

Post a Comment